Loading…
Siemens Gamesa was conditionally awarded the contract to deliver SG 8.0-167 DD offshore wind turbines for the 130 MW South Fork offshore wind project, expected to be operational by the end of 2022.
“SGRE was conditionally awarded the contract to deliver SG 8.0-167 DD offshore wind turbines for the 130 MW South Fork offshore wind-power project.”windsystemsmag.com
Summarized from public sources; check the original articles before acting on it.