Loading…
GE Steam Power received three contracts from NTPC to supply and install Wet Flue Gas Desulfurization systems for power plants at Jhajjar, Simhadri, and Sipat, with a combined value of Rs 2,311 crore (USD 335 million).
“GE Steam Power has got three contracts from NTPC to supply and install Wet FGD systems for a combined value of Rs 2,311 crore (USD 335 million).”electricalindia.in
Summarized from public sources; check the original articles before acting on it.