Automation and Roboticsworld trade 2024+4.2% 5Y CAGR
Electrical Equipmentworld trade 2024+7.2% 5Y CAGR
Process Solutions expands control panel manufacturing capacity by 30%
Process Solutions acquired a 5,000 sq. ft. facility in Arlington, WA and revised the layout of its Stanwood facility, increasing manufacturing capacity by 30% and reaching 115 employees.
Capacity
30% increase in manufacturing capacity
Productscontrol panels
“Process Solutions recently acquired a 5,000 Sq. Ft. facility in Arlington, WA.”processsolutions.com
- 1 source
- processsolutions.comProcess Solutions Expands Control Panel Manufacturing Capacity by 30% and Climbs to 115 Employees on Staff | Process Solutions, Inc.Jul 29, 2019
Summarized from public sources; check the original articles before acting on it.