Loading…
Doosan Skoda Power will supply a 155-MW steam turbine, generator and related equipment for the Zeran CCPP plant in Warsaw, Poland. The turbine will be part of a combined gas-steam cycle being built by a consortium of Mitsubishi Hitachi Power Systems Europe and Polimex-Mostostal. Assembly is expected to begin next month with completion by 2020.
“A 155-MW steam turbine manufactured by Doosan Škoda will be installed at new power plant in Warsaw.”power-eng.com
Summarized from public sources; check the original articles before acting on it.