Loading…

The START Centre and Memsift Innovations will jointly build a pilot wastewater treatment plant using a new tri-bore hollow-fibre membrane for a semiconductor factory in Singapore. The plant can treat up to 5,000 liters per day and is expected to save 1.6 million liters of water annually.
“The START Centre and Memsift Innovations will jointly build the wastewater treatment plant with the tri-bore hollow-fibre membranes, which can treat up to 5,000 litres per day for a semiconductor company.”filtsep.com
Summarized from public sources; check the original articles before acting on it.