Loading…
Kuraray is investing approximately $15 million to install plant-based high barrier resin production in Houston, Texas, with the plant scheduled to be completed in September 2019 and operating in early 2020.
“Kuraray is investing approximately $15 million to install plant-based high barrier resin production and supporting capabilities in Houston.”waste360.com
Summarized from public sources; check the original articles before acting on it.