Loading…
Nordex Group has entered an agreement with FAdeA to establish a local assembly line for nacelles and hubs of AW3000 turbines in Córdoba, Argentina. The facility will have an annual capacity of up to 150 turbines and is expected to start operation in 2019.
“In 2019 a new assembly line for wind turbines will be set up in Córdoba”nordex-online.com
Summarized from public sources; check the original articles before acting on it.