Loading…

Ssangyong Cement Industrial Co. held a ribbon-cutting ceremony for a 43.5 MWh waste heat power generator at its Donghae plant in Gangwon Province, South Korea. The company invested 100 billion won over 26 months to install the system, which will produce 280,000 MWh annually, saving about 27 billion won in power costs.
“The waste heat recovery unit uses high temperature heat reaching 1,450 Celsius degrees occurring from kilns in the course of producing clinkers or semi-products of cement.”pulse.mk.co.kr
Summarized from public sources; check the original articles before acting on it.