Loading…
Sigma Industrial Solutions redesigned and constructed a new production line for medium voltage switchgear panels at its Kitchener, Ontario factory to increase capacity by 50% and reduce costs.
“The project took three months in design phase, in where the design drawings for the production line with the modernized solutions had been approved and released for the construction phase which took almost the same period of time.”sigma-plus.ca
Summarized from public sources; check the original articles before acting on it.