Loading…

IPower LLC is installing industrial wastewater treatment and distilled water production equipment from Ecosoft at its battery plant under construction near Brest. Installation is scheduled for September 2018.
“Installation of pollution control equipment will be made in September, the installation will be carried out by representatives of the manufacturer who specially will arrive at the plant under construction”1ak-group.com
Summarized from public sources; check the original articles before acting on it.