Loading…

Clermont Auvergne Métropole awarded Degrémont a €53,892,675 contract for the design and construction of an extension of the Trois Rivières wastewater treatment plant, including a methanization unit for energy recovery from sludge.
“This award was granted to Degrémont by Clermont Auvergne Métropole for an amount of EUR 53,892,675.”sociedad.info
Summarized from public sources; check the original articles before acting on it.