Loading…
Suzhou Dosen Drilling & Production Equipment won the tender for shutoff and blowdown valves for the Lüda 16-3 natural gas compressor project, tendered by Offshore Oil Engineering. The winning bid was RMB 1,576,008 delivered on site after taxes.
“中标金额:RMB1,576,008.-(完税后现场交货价)”compressor.cn
Summarized from public sources; check the original articles before acting on it.