Loading…

Wharton-Smith was selected as general contractor to construct a new 3 MGD wastewater treatment plant on the Seminole Tribe of Florida's Hollywood Reservation. The project is valued at $54 million and is expected to begin in April 2018 and be completed by April 2020.
“Wharton-Smith’s South Florida Water/Wastewater Division was recently selected to construct a new 3 MGD wastewater treatment plant located at the Seminole Tribe of Florida’s Hollywood Reservation.”whartonsmith.com
Summarized from public sources; check the original articles before acting on it.