Loading…
Wabag won a $13 million turnkey contract to build the 150,000 m3/d Duong River Water Treatment Plant in Hanoi, Vietnam, serving about 3 million people. Completion is expected within 11 months.
“Wabag has secured a US$13 million order for the 150 000 m3/d Duong River Water Treatment Plant in Vietnam.”filtsep.com
Summarized from public sources; check the original articles before acting on it.