Loading…

Saudi Arabia announced the first construction phase of the Green Duba Integrated Solar Combined Cycle Plant in Tabuk region, with a capacity of over 605 MW including 50 MW renewable, costing SAR 4.5 billion ($1.2 billion).
“The project is said to cost some SAR 4.5 billion ($1.2 billion).”utilities-me.com
Summarized from public sources; check the original articles before acting on it.