Loading…
ABB has been selected by the CSTS Joint Operation to supply prefabricated electric substations for the Tangguh LNG expansion project in Indonesia, which includes a third LNG train adding 3.8 mtpa capacity.
“Integrated solutions in the form of prefabricated substation buildings allow projects to be delivered with reduced risk, lower cost and shorter schedules.”scandoil.com
Summarized from public sources; check the original articles before acting on it.