Loading…
PT Chandra Asri Petrochemical Tbk has signed an EPC contract with Toyo Engineering Group for the construction of a new 400 KTA polyethylene plant in Cilegon, Banten, Indonesia. The plant is targeted to start operations in 2020, increasing total PE capacity from 336 KTA to 736 KTA.
“This plant, which is targeted to operate in 2020, will increase PE total production capacity from 336KTA to 736KTA”chandra-asri.com
Summarized from public sources; check the original articles before acting on it.