Loading…
Prysmian received a €350 million contract from IFA2 SAS for a submarine and land power cable link between France and the UK. ABB received a €270 million order from National Grid and RTE for HVDC converter stations. The interconnector will transfer 1000 MW and is expected operational in 2020.
“This order further strengthens our leading HVDC position and provides momentum to our transformational drive for profitable growth, as a partner of choice for enabling a stronger, smarter and greener grid.”nsenergybusiness.com
Summarized from public sources; check the original articles before acting on it.