Loading…
Pro-Gest Group plans a greenfield corrugated sheet plant in Grezzago, Lombardy, at a cost of €55 million with annual capacity of 300 million square metres. Construction is expected to start in early 2018 and take about 18 months.
“The greenfield facility is to be erected in Grezzago in the Lombardy region, about halfway between Bergamo and Monza, at a cost of €55m.”euwid-paper.com
Summarized from public sources; check the original articles before acting on it.