Loading…
Oliver Valves India Private Limited moved into a new purpose-built 45,000 sq ft manufacturing facility in New Vellanur, Chennai, becoming fully operational on 2 January 2026. The site makes components up to three tonnes and adds in-house painting, non-destructive testing and an oxygen clean room.
“Oliver Valves India Private Limited has moved into a new purpose-built manufacturing facility with a built-up area of 45,000 square feet in New Vellanur, Chennai.”machinist.in
Summarized from public sources; check the original articles before acting on it.