Loading…
A 1,000 MW combined-cycle gas turbine power plant is being built on a 60-hectare site in Turkestan region, Kazakhstan. Equipment is 100% installed and commissioning is underway, with start-up planned for 2027. The project will create around 600 permanent jobs.
“Start-up is planned next year; around 600 permanent jobs are expected.”gateway-logistics.kz
Summarized from public sources; check the original articles before acting on it.