Loading…
Bell Oil and Gas unveiled a 50,000-tonne integrated OCTG pipe threading, valve assembly and composite pipe plant at the Lekki Free Trade Zone in Lagos, targeting an estimated $100m investment over five years.
“Bell Oil and Gas has unveiled its 50,000 metric tonnes integrated Oil Country Tubular Goods pipe threading, valve assembly, and composite pipes manufacturing facility, located at the Lekki Free Trade Zone, Lagos.”punchng.com
Summarized from public sources; check the original articles before acting on it.