Loading…
Hanwang Microelectronics (Liaoning) Co., Ltd. is building an 8-inch MEMS chip R&D and production base in Shenyang, with a total investment of 3 billion yuan. The project aims to achieve production line connection by the end of 2026.
“罕王微电子8英寸MEMS芯片研发设计及生产基地项目计划总投资30亿元、占地375亩,聚焦8英寸高端MEMS芯片研发设计与规模化量产。”eet-china.com
Summarized from public sources; check the original articles before acting on it.