Loading…
Kangda New Materials plans to invest 425 million yuan through its subsidiary to build production lines for 35,000 tons of wind turbine blade structural adhesive and 80,000 tons of vacuum infusion epoxy resin per year at its existing site in Tangshan, Hebei. The construction period is 12 months.
“Kangda New Materials announced on September 8 that it plans to invest in the 'Annual Production of 35,000 Tons of Wind Turbine Blade Structural Adhesive and 80,000 Tons of Wind Turbine Blade Vacuum Infusion Epoxy Resin Production and Construction Project'.”en.wedoany.com
Summarized from public sources; check the original articles before acting on it.