Loading…

German glass packaging manufacturer Ardagh Glass Packaging-Europe will replace the flue gas furnace at its Obernkirchen facility with two ammonia (R717) heat pumps with a combined heating capacity of 3.5MW. The system will be fully operational by November 2026.
“The two heat pumps have a combined heating capacity of 3.5MW and will be fully operational by November.”naturalrefrigerants.com
Summarized from public sources; check the original articles before acting on it.