Loading…
Yingde Zuotong Chemicals Co., Ltd. signed an agreement to build a plant in Yingde, Guangdong, China, with an annual capacity of 55,000 tonnes of coatings and 10,000 tonnes of additives. The total investment is 181 million yuan, with construction from 2026 to 2028.
“该项目计划总投资1.81亿元人民币,其中固定资产投资约1亿元,建设周期为2026年至2028年,用地规模33.3亩。”yingde.gov.cn
Summarized from public sources; check the original articles before acting on it.