Loading…
Westlake Pipe & Fittings announced on 23 May 2024 plans to add a 190,000 sq ft facility at its existing Wichita Falls, Texas site to manufacture molecular-oriented PVC (PVCO) pipe. Construction is slated to begin by the end of 2024.
“The expansion plan includes the addition of a 190,000 square-foot facility to the existing site situated at 3348 Industrial Drive, leveraging the region's strategic geographic location in the heart of the United States.”westlake.com
Summarized from public sources; check the original articles before acting on it.