Nemera to build new production hall at La Verpillière site
Nemera is constructing a new 5,000 sqm production hall at its La Verpillière site in France, with 4,500 sqm dedicated to manufacturing. Production is scheduled to start in the second half of 2027, creating 150 jobs by 2028.
Capacity
5,000 sqm production hall (4,500 sqm manufacturing)
Productsdrug delivery devicesinjection pens
“Construction work will take place throughout 2026, with production scheduled to start in the second half of 2027.”nemera.net
- 3 sources
- nemera.netConstruction of a new production hall at its La Verpillière SiteAbout NemeraApr 14, 2026
- drug-dev.comNemera Announces Construction of a New Production HallDan MarinoApr 16, 2026
- leprogres.frRhône. Avec sa nouvelle unité de production, ce groupe lyonnais de plasturgie vise 150 emplois de plusBenjamin CovarelApr 27, 2026
Summarized from public sources; check the original articles before acting on it.