Loading…

Barrier Group has been awarded a contract by Technip Energies to design, engineer and supply HVAC systems for the turbine hall of the NZT Power gas-fired power station with carbon capture in Teesside, UK.
“Barrier Group...has secured a key role in one of the UK’s most significant low-carbon infrastructure projects...The company has been awarded a contract for NZT Power...to deliver the design, engineering and supply of heating, ventilation and air conditioning (HVAC) systems for the new power station ”barriergroup.com
Summarized from public sources; check the original articles before acting on it.