Loading…

Babcock & Wilcox Enterprises signed a $2.4 billion design-build agreement with Base Electron to deliver four 300 MW natural gas-fired boiler and steam turbine systems for an AI data center.
“The company secured a $2.4 billion contract with Base Electron to deliver four 300‑megawatt natural gas-fired boiler and steam turbine systems to power Applied Digital AI data centers.”stocktitan.net
Summarized from public sources; check the original articles before acting on it.