Loading…

GE Vernova secured a contract with Lincoln Electric System to supply two LM6000VELOX aeroderivative gas turbine packages for the Terry Bundy Generating Station in Lincoln, Nebraska. The expansion will add approximately 100 MW of capacity, scheduled to become operational in 2029.
“GE Vernova Inc. today announced that it has secured a contract with Lincoln Electric System (LES) to supply two LM6000VELOX* aeroderivative gas turbine packages for the Terry Bundy Generating Station (TBGS) in Lincoln, Nebraska.”gevernova.com
Summarized from public sources; check the original articles before acting on it.