Loading…

ABB India Limited secured a material order from Titagarh Rail Systems Ltd to supply 40 six-car trainsets (18 for Line 6 and 22 for Line 5), including traction converters, auxiliary converters, traction motors, and TCMS software. The order was received on January 27, 2026, and will be executed over the next 3-4 years.
“ABB India Limited has secured a material order from Titagarh Rail Systems Ltd for supplying 40 six-car trainsets, including 18 for Line 6 and 22 for Line 5.”scanx.trade
Summarized from public sources; check the original articles before acting on it.