Loading…
ANDRITZ received a mid double-digit million-euro contract from TVA to supply two Spray Dry Absorber systems for the Shawnee Fossil Plant in Kentucky.
“The contract — valued in the mid double-digit million-euro range and recorded in ANDRITZ’s Q3 2025 order intake — covers the delivery of two high-efficiency Spray Dry Absorber (SDA) systems for Boiler Units 8 and 9.”news.europawire.eu
Summarized from public sources; check the original articles before acting on it.