Loading…
Beijing OriginWater Technology Co., Ltd. (consortium with CCCC Second Harbor Engineering Co., Ltd. and Tianjin Municipal Engineering Design & Research Institute) was named the top candidate for the Kekedala Economic Development Zone wastewater resource utilization project phase II (EPC+O) in Xinjiang, China, with a bid of 211,189,045.90 yuan (approx. USD 29.2 million). The project includes a new 10,000 m³/day wastewater treatment plant.
“中标候选人第一名:北京碧水源科技股份有限公司(中交第二航务工程局有限公司、天津市政工程设计研究总院有限公司),投标报价:211189045.9000元”h2o-china.com
Summarized from public sources; check the original articles before acting on it.