Loading…
UK Industrial Fusion Solutions Ltd awarded a £293,959 contract to ICS Cool Energy Limited for a cooling system for the High Heat Flux Testing and Verification Facility for the STEP fusion project. The contract was awarded on 16 October 2025.
“This system will include: Temperature Control Unit (226 kW cooling capacity, 150 kW heating capacity and a maximum operating temperature of 350°C) Chiller (350 kW cooling capacity)”find-tender.service.gov.uk
Summarized from public sources; check the original articles before acting on it.