# Group Energy Gas Panama

- Headquarters: Panama



## Announcements (1)

- 2022-04-01: [Generadora Gatún 670MW gas-fired power plant under construction in Panama](https://endata.com/announcements/66969-generadora-gatun-670mw-gas-fired-power-plant-under-construction-in-panama) (New facility · Colón, Colón Province, Panama · $1.00B · starts operating 2024)

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
