# Marcegaglia signs letter of intent with EDF for nuclear power supply at Fos-sur-Mer steel plant

Marcegaglia signed a letter of intent with EDF for the supply of competitive nuclear electricity for at least 10 years to its steel plant in Fos-sur-Mer, France. The project includes a €750 million investment to increase production capacity from 150,000 to 2.1 million tonnes per year, with production start planned for mid-2028.

- Type: Contract
- Announced: 2025-06-25
- Where: Fos-sur-Mer, France
- Value: $815.0M (750.0M EUR)
- Status: announced
- Capacity: 2.1 million tonnes per year
- Products: steel billets, slabs, hot-rolled coils
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [Marcegaglia](https://endata.com/companies/24769.md)
- [EDF](https://endata.com/companies/771.md) (supplier)

## Sources

- [fos-sur-mer.marcegaglia.com](https://fos-sur-mer.marcegaglia.com/nucleaire-une-lettre-dintention-signee-avec-edf-pour-lapprovisionnement-en-electricite-du-site-de-fos-sur-mer/), 2025-06-25: "Avec cette lettre d'intention, nous réaffirmons notre engagement en faveur de la décarbonation de l'ensemble de la production du Groupe."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
