# Doosan Enerbility wins $250M Saudi gas power plant equipment deal

Doosan Enerbility signed a contract worth about $250 million to supply steam turbine and generator packages for the expansion of the Ghazlan 2 and Hajr gas-fired power plants in Saudi Arabia.

- Type: Contract
- Announced: 2025-05-27
- Where: Saudi Arabia, Saudi Arabia
- Value: $250.0M
- Status: announced
- Products: steam turbines, generators
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Doosan Enerbility](https://endata.com/companies/9315.md) (supplier)

## Sources

- [pulse.mk.co.kr](https://pulse.mk.co.kr/news/english/11327422), 2025-05-27: "Doosan Enerbility Co. announced Tuesday that it has signed a contract to supply core equipment for gas-fired combined cycle power plants in Saudi Arabia."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
