# Raptor Power Systems opens new manufacturing facility in Champaign, Illinois

Raptor Power Systems opened a new 65,000 sq ft manufacturing facility in Champaign, Illinois, to produce Power Distribution Units and Breaker Panels, complementing its existing operations in Eatontown, New Jersey.

- Type: New facility
- Announced: 2025-04-29
- Where: Champaign, Illinois, United States
- Starts operating: 29 Apr 2025
- Status: completed
- Capacity: 65,000 sq ft
- Products: Power Distribution Units, Breaker Panels
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Raptor Power Systems](https://endata.com/companies/84445.md)

## Sources

- [benzinga.com](https://www.benzinga.com/pressreleases/25/04/n45074249/raptor-power-systems-expands-manufacturing-capabilities-with-new-facility-in-champaign-illinois), 2025-04-29: "This facility is more than just an expansion; it's a testament to our commitment to staying ahead in an evolving industry."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
