# Baker Hughes to supply Driftwood LNG Phase 1 compression packages for Tellurian

Baker Hughes agreed to supply eight main refrigerant compression packages, including LM6000PF+ gas turbines and refrigerant compressors, for Phase 1 of Tellurian's Driftwood LNG project. The agreement supports initial LNG production targeted for 2027.

- Type: Contract
- Announced: 2023-09-05
- Where: United States
- Status: announced
- Capacity: eight refrigerant compression packages for Phase 1
- Products: LM6000PF+ gas turbines, refrigerant compressors, integrated compressor line packages, control units
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Baker Hughes](https://endata.com/companies/1895.md) (supplier)
- [Tellurian](https://endata.com/companies/9412.md) (customer)

## Sources

- [business.woonsocketcall.com](https://business.woonsocketcall.com/observerreporter/article/gnwcq-2023-9-6-tellurian-and-baker-hughes-announce-agreement-for-driftwood-lng-phase-1-liquefaction-equipment), 2023-09-06: "The agreement secures a delivery schedule for the eight LM6000PF+ gas turbines, main refrigerant compressors, and control units required for Phase 1"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
