# ELSIB manufactures turbine generator for Novosibirsk TPP-3 expansion

ELSIB has manufactured a new turbine generator for Novosibirsk TPP-3, which will increase the station's capacity by 20 MW. Installation is underway, with completion planned by 2026. SGK has planned investments of over 12 billion rubles for the upgrade.

- Type: Expansion
- Announced: 2025-04-08
- Where: Novosibirsk, Russia
- Starts operating: 2026
- Status: under construction
- Capacity: 20 MW increase
- Products: turbine generator
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [ELSIB](https://endata.com/companies/34349.md)
- [Siberian Generating Company](https://endata.com/companies/51414.md) (investor)

## Sources

- [armtorg.ru](https://armtorg.ru/news/54104/), 2025-04-08: "Завершить процесс сборки генерирующего оборудования энергетики планируют к 2026 году."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
