# GE Vernova spending $160M to expand gas turbine plant in South Carolina

GE Vernova is investing over $160 million to overhaul its gas turbine plant in Greenville, South Carolina, aiming to increase output by about 35% by the end of 2026.

- Type: Expansion
- Announced: 2025-04-08
- Where: Greenville, South Carolina, United States
- Value: $160.0M
- Starts operating: 2026
- Status: under construction
- Capacity: 35% increase in gas turbine output
- Products: gas turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [GE Vernova](https://endata.com/companies/2947.md)

## Sources

- [districtenergy.org](https://www.districtenergy.org/blogs/district-energy/2025/04/08/why-a-plane-size-machine-could-foil-a-race-to-buil), 2025-04-08: "The company, formed last year in the breakup of General Electric, is spending more than $160 million to overhaul its gas turbine plant on the edge of Greenville, S.C."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
