# TE Connectivity expands smart grid production site in Waiblingen, Germany

TE Connectivity held a ribbon-cutting ceremony on February 27, 2025, to open its expanded site in Waiblingen, Germany. The expansion doubled production capacity with a second automated line and increased the hub's size from 1,800 to 5,000 square meters.

- Type: Expansion
- Announced: 2025-02-27
- Where: Waiblingen, Germany, Germany
- Jobs: 120
- Starts operating: 27 Feb 2025
- Status: completed
- Capacity: doubled production capacity
- Products: smart grid monitoring solutions, connectors, sensors
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [TE Connectivity](https://endata.com/companies/16155.md)

## Sources

- [te.com](https://www.te.com/en/about-te/news-center/te-connectivity-expands-energy-smart-grid-site-in-germany.html), 2025-02-28: "The expanded innovation, engineering, and production facility enables TE to better serve utilities, OEMs, industrials, data centers, and renewable energy operators in Germany and around the world."
- [electronicsmedia.info](https://www.electronicsmedia.info/2025/04/03/te-connectivity-expands-energy-smart-grid-site-in-germany/), 2025-04-03: "Our investment in this smart-grid production facility positions us to keep pace with our customers’ needs and continue to develop innovative solutions for a more sustainable and connected future."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
