# ACWA Power and IC İçtaş İnşaat win Azerbaijan's first PPP tender for seawater desalination plant

A consortium of ACWA Power and IC İçtaş İnşaat won the tender for the Khazar SWRO project, a seawater desalination plant with a capacity of 300,000 cubic meters per day near Baku, Azerbaijan. The project will be transferred to the government after 27.5 years.

- Type: Contract
- Announced: 2025-01-20
- Where: Baku and Absheron Peninsula, Azerbaijan
- Status: announced
- Capacity: 300,000 cubic meters per day
- Products: desalinated water
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [ACWA Power](https://endata.com/companies/5576.md) (partner)
- [IC İçtaş İnşaat](https://endata.com/companies/82420.md) (partner)

## Sources

- [patronlardunyasi.com](https://www.patronlardunyasi.com/azerbaycanin-ilk-kamu-ozel-sektor-ortakligi-ihalesini-suudi-acwa-ile-ic-ictas-insaat-kazandi), 2025-01-20: "Azerbaycan’ın ilk kamu özel sektör ortaklığı ihalesini Suudi ACWA Power ile IC İçtaş İnşaat konsorsiyumu kazandı"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
