# Wärtsilä signs 10-year service agreement with Xcel Energy for two power plants

Wärtsilä signed a ten-year Long-Term Optimised Maintenance Agreement with Xcel Energy covering two new power plants in Minnesota and Wisconsin: the 29 MW Blue Lake plant and the 48 MW Wheaton plant. The order was booked in Q3 2024.

- Type: Contract
- Announced: 2025-01-16
- Where: Minnesota and Wisconsin, United States
- Status: completed
- Products: maintenance services for power plants
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Wärtsilä](https://endata.com/companies/254.md)
- [Xcel Energy](https://endata.com/companies/32627.md) (customer)

## Sources

- [webwire.com](https://www.webwire.com/ViewPressRel.asp?aId=332684), 2025-01-16: "Wärtsilä has signed a ten-year Long-Term Optimised Maintenance Agreement with Xcel Energy."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
