# New Energy Glass starts construction of $300M glass plant in Ain Sokhna, Egypt

New Energy Glass has begun construction of a glass manufacturing plant in the TEDA Egypt industrial zone at Ain Sokhna, with investments of $300 million, on a 500,000 sqm site, producing 1,000 tonnes/day of flat glass and 800 tonnes/day of photovoltaic glass, creating 1,000 jobs.

- Type: New facility
- Announced: 2024-12-02
- Where: Ain Sokhna, Egypt, Egypt
- Value: $300.0M
- Jobs: 1,000
- Status: under construction
- Capacity: 1,000 tonnes/day flat glass, 800 tonnes/day photovoltaic glass
- Products: flat glass, photovoltaic glass
- Sectors: [Construction Materials](https://endata.com/sectors/construction-materials.md)

## Companies

- [New Energy Glass](https://endata.com/companies/81477.md)

## Sources

- [aswaqinformation.com](https://www.aswaqinformation.com/211374), 2024-12-02: "تعتزم شركة "نيوإنرجي جلاس" للزجاج ضخ استثمارات بقيمة 300 مليون دولار بمنطقة تيدا – مصر بالمنطقة الصناعية بالعين السخنة."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
