# Tosyali flat steel complex in Algeria begins operations with 2.5 million tonne capacity

The flat steel complex at Tosyali's iron and steel plant in Bethioua, Oran, Algeria, entered service in late October 2024 with an annual production capacity of 2.5 million tonnes. A cold rolling mill is expected to be completed in the first half of 2026.

- Type: Expansion
- Announced: 2024-11-27
- Where: Bethioua, Oran, Algeria
- Jobs: 2,200
- Starts operating: Oct 2024
- Status: completed
- Capacity: 2.5 million tonnes per year
- Products: flat steel, hot-rolled coils, cold-rolled coils
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [Tosyali Holding](https://endata.com/companies/24201.md)

## Sources

- [news.radioalgerie.dz](https://news.radioalgerie.dz/ar/node/55865), 2024-11-27: "دخل مركب المسطحات الحديدية بمركب الحديد والصلب 'توسيالي' الكائن مقره ببطيوة (وهران) حيز الخدمة، أواخر شهر أكتوبر المنصرم، بطاقة إنتاجية تقدر ب 2.5 مليون طن سنويا."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
