# GASA installs EAF for new steel plate plant in Mexico

Grupo Acerero (GASA) completed installation of an electric arc furnace (EAF) for a new steel mill to produce slab and sheet steel plate, with a capacity of 650,000 metric tons per year. The company will invest $150 million in the Beskar Project. Slab production is expected to begin in April 2025.

- Type: New facility
- Announced: 2024-11-04
- Where: Mexico
- Value: $150.0M
- Starts operating: Apr 2025
- Status: under construction
- Capacity: 650,000 metric tons per year of sheet steel plate
- Products: slab, sheet steel plate
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [Grupo Acerero](https://endata.com/companies/43107.md)

## Sources

- [steelorbis.com](https://www.steelorbis.com/steel-news/latest-news/mexican-steelmaker-gasa-installs-eaf-in-plant-to-produce-650000-mt-of-steel-plate-1364357.htm), 2024-11-04: "Grupo Acerero (GASA), the fifth largest producer of rods in Mexico, completed the installation of certain equipment for a new plant to produce slab and later sheet steel plate."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
