# PCL Construction and Stantec awarded $600M contract for wastewater plant rehab and expansion

The U.S. Section of the International Boundary and Water Commission awarded a $600 million contract to PCL Construction and Stantec for the rehabilitation and expansion of the South Bay International Wastewater Treatment Plant in San Diego, doubling capacity to 50 MGD.

- Type: Contract
- Announced: 2024-11-04
- Where: San Diego, California, United States
- Value: $600.0M
- Status: announced
- Capacity: 50 million gallons per day (treatment), 75 MGD peak
- Products: wastewater treatment
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [PCL Construction](https://endata.com/companies/15665.md)
- [Stantec Inc.](https://endata.com/companies/22986.md) (partner)
- [International Boundary and Water Commission](https://endata.com/companies/65736.md) (customer)

## Sources

- [californiaconstructionnews.com](https://www.californiaconstructionnews.com/2024/11/04/pcl-construction-and-stantec-awarded-600-million-contract-for-south-bay-international-wastewater-treatment-plant-rehab-expansion/), 2024-11-04: "PCL Construction will lead design and construction for the rehabilitation and expansion of the South Bay International Wastewater Treatment Plant (SBIWTP) in San Diego, partnering with Stantec for the project's design using a progressive design-build delivery model."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
