# Shanghai Electric wins order for Yuezhou power plant main equipment

Shanghai Electric Power Station Group won a contract to supply the complete main equipment for the Yuezhou 2×1000MW coal-fired power plant project in Yueyang County, Hunan Province. The project is scheduled for completion in the first half of 2027.

- Type: Contract
- Announced: 2024-11-04
- Where: Yueyang County, Hunan Province, China
- Status: announced
- Capacity: 2×1000MW
- Products: coal-fired power generation main equipment
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Shanghai Electric Power Station Group](https://endata.com/companies/80997.md) (supplier)
- [Xiangtou Energy Yuezhou](https://endata.com/companies/80998.md) (customer)

## Sources

- [beta.zhitongcaijing.com](http://beta.zhitongcaijing.com/content/detail/1206107.html), 2024-11-04: "近日，上海电气电站集团成功中标湘投能源岳州2×1000MW燃煤发电工程项目机电炉辅全套主设备订单。"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
